Sarasota: 5G install error leads to a 3,000 gallon raw wastewater spill

 

 

Pursuant to Section 403.077, F.S., the Department of Environmental Protection has received the following Public Notice of Pollution for a reportable release. All information displayed was submitted by the reporting party.

Type of Notice: Initial Report
Date of Notice: 10/10/2020

Incident Information
Name of Incident: City of Sarasota Cardinal Place Spill
State Watch Office Case Number: 20205641
Start of Incident: 10/09/2020 11:20
End of Incident: 10/09/2020 13:00

Incident Description
A Verizon contractor boring 5G conduit throughout the City bored through an 8″ PVC force main at 2610 Cardinal Place. City crews immediately responded to the site to shut down the lift station and take steps to contain the spill. Tankers were used to haul the wastewater from the lift station until repairs were complete. The damaged section of pipe was removed and replaced. Approximately 3,000 gallons of raw wastewater was spilled at the site. Crews were able to recover approximately 1,000 gallons. The remaining wastewater entered the storm drain that flows to Sarasota Bay. Samples will be collected. The affected area was treated with lime, hosed down and vacuumed up.

Incident Location
Facility/Installation Name: City of Sarasota AWWTP
Address Line 1: 1750 12th Street
Address Line 2:
Directions:
City: Sarasota
State: FL
Zip Code: 34236
Coordinates (in decimal degrees):
Lat: 27.31, Long: -82.538
Click to view Incident Location
Impacted Counties: Sarasota

Incident Reported By
Name: Verne Hall
Title: Utilities General Manager
Phone: (941) 661-1347
E-mail Address: [email protected]

On-Site Contact
Name: Verne Hall
Phone: (941) 661-1347
Ext:
E-mail Address: [email protected]

To view a list of all received Public Notices of Pollution or to modify your e-mail subscription settings, please click the link below:
Public Notice of Pollution

Florida Department of Environmental Protection